Production Line Comparison Calculator

Production Line Comparison Calculator

Production Line Comparison Calculator

Compare the production capacity and annual costs of a melanger line with a production line consisting of a pre-grinder, ball mill and conche.

Melanger Line
Pre-Grinder + Ball Mill + Conche
Production Capacity

Melanger Line Capacity

kg
units
hours
kW
€
Operators required simultaneously 1
Staff schedule Flexible · actual labor hours
Manual labor per batch 3.5 hours
Monthly staff hours 140 hours
Monthly production 1,700 kg
Annual production 20,400 kg

Load, units and processing time must be greater than zero. Power must be zero or greater.

Ball Mill Line Capacity

Pre-Grinder

kg/h
units
kW
€

Ball Mill

kg
hours
units
kW
€

Conche

kg
hours
units
kW
€
Operators required simultaneously 2
Staff schedule 20 working days · 8 h/day
Manual labor per batch 4 hours
Monthly staff hours 320 hours
Monthly production 2,000 kg
Annual production 24,000 kg

All capacities, processing times and equipment quantities must be greater than zero. Power values must be zero or greater.

Annual Costs

Melanger Line Costs

€/h
€/kWh
€
years
  • Annual manual labor0 h
  • Annual personnel cost€0
  • Annual electricity cost€0
  • Annual depreciation€0
Total annual cost€0

Please check the values entered.

Ball Mill Line Costs

€/h
€/kWh
€
years
  • Annual manual labor0 h
  • Annual personnel cost€0
  • Annual electricity cost€0
  • Annual depreciation€0
Total annual cost€0

Please check the values entered.

Cost per kg
Estimated production cost €0.00 /kg Total annual cost ÷ annual production
Estimated production cost — /kg Total annual cost ÷ annual production
Cost per month EUR
Estimated total cost €3,364 Total annual cost ÷ 12
Estimated total cost €6,640 Total annual cost ÷ 12
Cost per 1 year EUR
Estimated total cost €40,363 Total annual cost
Estimated total cost €79,678 Total annual cost
Cost for 5 years EUR
Estimated total cost €201,816 Total annual cost × 5
Estimated total cost €398,389 Total annual cost × 5

Calculation note: For each melanger batch, loading requires 1.5 staff hours and unloading requires 2 staff hours, giving 3.5 hours of manual labor. For production planning, one handling day is added to the entered grinding time. At 48 hours of grinding, this gives one batch every three days, or 10 batches per melanger per 30-day month. One operator can serve up to three melangers simultaneously, so the required operator count is rounded up for each group of three machines. Melanger staff hours equal completed batches × 3.5 hours plus 70 hours per month for other work; no fixed 8-hour staff day is assumed. The industrial line uses one operator per ball mill, 20 working days per month and an 8-hour shift. Each ball mill is limited to two batches per day. Actual line output is the lowest capacity of the pre-grinder, ball mills and conches. The conche is assumed to run one batch per machine overnight on each operating day. Electricity is calculated from nominal power and calculated operating hours; idle consumption is excluded. The entered electricity rate is shared by both lines. For reference, the EU average non-household price was €0.1837/kWh in the second half of 2025 (Eurostat). Equipment investment is calculated from entered quantities and editable unit prices. Cleaning, maintenance and technical downtime are not included.

Done!
We will contact you in our working hours.
Thank you!
loading Sending...